Approximately 2,200 feet of 60-inch AMERICAN Steel Pipe was installed near Nissan Stadium in Nashville, Tennessee, in the spring, summer and fall of 2023. At the same time, numerous events were held at the stadium including the Indy Music City Grand Prix and Taylor Swift Eras Tours concerts.
Read MoreTag: Garney Construction
The stakes were high in April 2022 when JEA began building a new water reclamation facility. The new plant – Duval County’s first of this type in 45 years – would treat wastewater to be used for commercial and residential irrigation in a growing area southeast of the city.
Read MoreMore than 13 miles of AMERICAN ductile iron pipe and nearly two dozen AMERICAN Flow Control® resilient wedge gate valves with Flex-Ring® ends are playing an important role in providing safe, affordable drinking water to fast-growing Paulding County, Georgia, one of the only counties in the metro-Atlanta region without an independent water supply.
Read MoreSix million gallons of water per day (MGD) sounds like a lot of water, and it is, but it wasn’t enough to meet Limestone County’s projected demands for drinking water. Around 1,000 customers were being added each year, and a number of inquiries had been made about increased industrial development.
Read More