The $50 million Lake Region Water Treatment Plant allowed three cities to end their reliance on Lake Okeechobee as a water source, providing relief to the lake in drought conditions. The Lake Region facility is located in western Palm Beach County and has a production capacity of 10 million gallons per day. Drawing water from the Upper Floridan aquifer instead of Lake Okeechobee, it serves Belle Glade, Pahokee and South Bay, eliminating or reducing future withdrawals from the lake by those communities.
Read MoreTag: Fastite
The Lake Barkley Transmission Main consists of a new intake and pump station on Lake Barkley, with a line running 27 miles from there to a 220-million-gallon reservoir in Hopkinsville. A major part of the project was the purchase of the right-of-way of the abandoned Tennessee Central/ICG railroad bed between Hopkinsville and Gracey. That right-of-way represents roughly half of the 27 miles traversed by the transmission line.
Read MoreThe Columbus Water Works (CWW) and Fort Benning signed an agreement in 2004 calling for CWW to provide the military base water and wastewater services for 50 years. Fort Benning’s water and wastewater systems were subsequently connected with CWW’s, and several large upgrades were begun.
Read More